=== Start project === |
=== Start project === |
||
− | On the first of February 2018, the project started to map different alternative designs based on previous studies and outcomes of new studies. Two researchers of the Building with Nature group of HZ coordinated this research and guided the involved students. The expertise of researchers of water safety and spatial planning, civil engineering and vitality and tourism was added. A stakeholder meeting was organised the 14<sup>th</sup> of June to share the outcomes of the first six months and to organize discussion about the different alternative designs. |
+ | [[Bestand:Town hall.jpg|miniatuur|Visitors at the meeting during the poster presentation.]] |
+ | On the first of February 2018, the project started to map different alternative designs based on previous studies and outcomes of new studies. Two researchers of the Building with Nature group of HZ coordinated this research and guided the involved students. The expertise of researchers of water safety and spatial planning, civil engineering and vitality and tourism was added. A stakeholder meeting was organised the 14<sup>th</sup> of June in the former town hall of Middelburg to share the outcomes of the first six months and to organize discussion about the different alternative designs. |
||
==== Ecosystem services ==== |
==== Ecosystem services ==== |
||
− | Groups of students compared the alternative designs for ecosystem services: |
+ | Groups of students compared the alternative designs for ecosystem services ({{Cite|resource=Bestand:Infographic ESS schorrepolder versie 4 nederlands ESS.pdf|name=click for infographic|dialog=process-file-dialog}}): |
# Sustainable use of abiotic resources ({{Cite|resource=Bestand:Abiotic resources.pdf|name=Sinke et al. 2018|dialog=process-file-dialog}}) |
# Sustainable use of abiotic resources ({{Cite|resource=Bestand:Abiotic resources.pdf|name=Sinke et al. 2018|dialog=process-file-dialog}}) |
||
# Use as a nursery for fish ({{Cite|resource=Bestand:Nursery for Fish.pdf|name=Lee et al. 2018|dialog=process-file-dialog}}) |
# Use as a nursery for fish ({{Cite|resource=Bestand:Nursery for Fish.pdf|name=Lee et al. 2018|dialog=process-file-dialog}}) |
On the first of February 2018, the project started to map different alternative designs based on previous studies and outcomes of new studies. Two researchers of the Building with Nature group of HZ coordinated this research and guided the involved students. The expertise of researchers of water safety and spatial planning, civil engineering and vitality and tourism was added. A stakeholder meeting was organised the 14th of June in the former town hall of Middelburg to share the outcomes of the first six months and to organize discussion about the different alternative designs.
Groups of students compared the alternative designs for ecosystem services (click for infographic):
The possibilities for Schorerpolder are limited because of its location, what is to be found below and above the surface and where it is currently used for. The layer approach was used to define the spatial impact of the area. The most important outcome of the research was the amount of cables and tubes that where present in the area, all of importance to the harbor (Lambregts, 2018).
The four different designs of Schorerpolder, were assessed based on the ecosystem services and expenses on creation and maintenance.
The interactive meeting showed that the majority of the stakeholders were in favor of designs controlled tide and combined perspectives. Further research needs to be done on CO2 reduction capacity of salt marshes.