(Label: visualeditor)
|
|
||
(2 tussenliggende versies door dezelfde gebruiker niet weergegeven) | |||
Regel 1: | Regel 1: | ||
− | [[Bestand:Playing with currents.jpg|miniatuur|429x429px|Minor participants who have specified and built the test installation ( |
+ | [[Bestand:Playing with currents.jpg|miniatuur|429x429px|Minor participants who have specified and built the test installation (June 2018).]] |
===About this project=== |
===About this project=== |
||
====Goal of the project==== |
====Goal of the project==== |
||
Regel 28: | Regel 28: | ||
*Credits: 30 ECTS |
*Credits: 30 ECTS |
||
*Minimum grade: 5.5 (out of 10) |
*Minimum grade: 5.5 (out of 10) |
||
− | *Sign up: HZ students: |
+ | *Sign up: HZ students: send an E-mail to Gabriëlle Rossing - [mailto:gabrielle.rossing@hz.nl <u>gabrielle.rossing@hz.nl</u>]. External students: go to <u>{{External link|resource=Resource Hyperlink 00334|name=Kies op Maat|dialog=process-linkwebsite-dialog}}</u> '''>''' select the minor of your choice. |
− | |||
*Contact: for information about the project: Jan Maas - [mailto:maas0094@hz.nl <u>maas0094@hz.nl</u>]. For general information about the minor: Gabriëlle Rossing - [mailto:gabrielle.rossing@hz.nl <u>gabrielle.rossing@hz.nl</u>] |
*Contact: for information about the project: Jan Maas - [mailto:maas0094@hz.nl <u>maas0094@hz.nl</u>]. For general information about the minor: Gabriëlle Rossing - [mailto:gabrielle.rossing@hz.nl <u>gabrielle.rossing@hz.nl</u>] |
||
{{Project config}} |
{{Project config}} |
||
Regel 39: | Regel 38: | ||
|End date=2019/06/30 |
|End date=2019/06/30 |
||
|Summary=In this project you will contribute to the development of a fast switching tidal power plant. |
|Summary=In this project you will contribute to the development of a fast switching tidal power plant. |
||
− | |Show summary= |
+ | |Show summary=Nee
|
|Show navigation tree=Ja |
|Show navigation tree=Ja |
||
|Create process and content pages=Nee |
|Create process and content pages=Nee |
Performing of a test program on the Playing with Current test-installation in the PSD building, to assess the flexibility of the pump/turbine in several operation modes using a fast switching Louvre valve and a fast frequency control drive.
Generation and storage of renewable electricity with a tidal power plant which can very quickly produce or absorb electricity.
Lectorate Delta Power and all the parties involved in the Raak-Pro Project “Playing with Currents”.
Development of low-head fast switching tidal turbines which can be applied in the future Brouwersdam tidal power plant. Perhaps the stakeholders come up with other prototypes which can be tested in the “Playing with Currents” test installation.
Performing of tests, analyzing of results, and giving recommendations for the design of a faster and more flexible tidal turbine.
Test results and analysis, and recommendation for a better design of tidal turbines. Assessment and minimization of losses due to friction and turbulence, and wear of components.
Execution of a test plan, drawing conclusions and validating them for a better design.
Engineering, Mechatronics, EPT.
Doing research, interpreting data and drawing conclusions.
A coach and the workfield (organizations, professorships, etc.) will coach you and collaborate with you to developing the results and your professional skills required for this project.
Start date: | februari 1, 2019 |
End date: | juni 30, 2019 |