The aim of this work package is to ensure a well-managed project. The project is controlled by a Steering Group under the leadership of a project manager designated by the lead partner. All partners will operate in regional groups led by a regional coordinator. The transnational work groups at work package level shall report to the Steering Group. Overall project management includes financial management and reporting to NSR JTS. Focus Groups formed by experts throughout the partnership specialise on joint problem-solving for a specific pilot.
The knowledge institutes will form a working group that coordinates the integration of approaches and results in order to further support capacity building across the partnership and the NSR. The knowledge institutes in the project form the core of the transnational expert team that shares, collects and analyses information and experiences.
Authorities will work together to provide the local, regional and national knowledge that is necessary to successfully integrate MLS in the spatial, environmental, economic and legal context.
The non-governmental organisations will bring the project closer to the communities that are under risk of being flooded and therefore allow bottom-up approach when improving resilience.
Start date: | oktober 1, 2016 |
End date: | januari 31, 2020 |
Project | Start date | End date | Summary |
---|---|---|---|
Finance managers meeting | 1 oktober 2016 | 31 januari 2020 | At the start of the project, a meeting of the Finance managers (and FLCs) of the beneficiaries is organised by the Lead Beneficiary to present and discuss eligibility rules, reporting structures and common costs (incl. settlement) |
Partner meetings | 21 december 2016 | Each year at least three partner steering group meetings will be held. | |
Reporting | 1 oktober 2016 | 31 januari 2020 | Preparing and submitting the bi-annual progress and financial reports including the control and verification by the First Level Controllers of the respective partner organisations and the verification of the consolidated report by the LB FLC |
Participant | Role |
---|---|
Hans de Bruin | Projectmedewerker |
No students included yet.
No sources added yet.
Page name | Title | Author(s) | Date | |
---|---|---|---|---|
Bestand:20180430 Paper Aesop FRAMES.pdf | Bestand:20180430 Paper Aesop FRAMES.pdf | Adaptive planning for flood resilient areas: dealing with complexity in decision-making about multilayered flood risk management | Buijs, J-M., Boelens, L., Bormann, H., Restemeyer, B., Terpstra, T. | januari 1, 2018 |
Bestand:Comparing the flood resilience of Southwell with the Dutch MLS approach (verbeterde versie).pdf | Bestand:Comparing the flood resilience of Southwell with the Dutch MLS approach (verbeterde versie).pdf | Exploratory study Southwell pilot by HZ students | Students of HZ University of Applied Sciences | januari 20, 2017 |
Bestand:FRAMES Monitoring Survey 1 Alblasserwaard Completed.pdf | Bestand:FRAMES Monitoring Survey 1 Alblasserwaard Completed.pdf | Monitoring survey Frames | Smeets, L., Neefjes, P., Revet, C. & Wijnen, D. | september 6, 2018 |
Bestand:Final Report Draft 1.0 Vejle.pdf | Bestand:Final Report Draft 1.0 Vejle.pdf | Exploratory study Vejle pilot by HZ students | Students of HZ University of Applied Sciences | januari 20, 2017 |
Bestand:Final Research Denderleeuw Research Assignment (verbeterde versie).pdf | Bestand:Final Research Denderleeuw Research Assignment (verbeterde versie).pdf | Exploratory study Denderleeuw pilot by HZ students | Students of HZ University of Applied Sciences | januari 20, 2017 |
Bestand:Final Thesis Community Resilience Assessment Tool Izhar van EenennaamV4.pdf | Bestand:Final Thesis Community Resilience Assessment Tool Izhar van EenennaamV4.pdf | Final Thesis Report Izhar van Eenennaam | Izhar van Eenennaam | juni 5, 2017 |
Bestand:Final report Wesermarsch research PDF.pdf | Bestand:Final report Wesermarsch research PDF.pdf | Exploratory study Wesermarsch pilot by HZ students | Students of HZ University of Applied Sciences | januari 20, 2017 |
Bestand:Frames pilotbook april 2017.pdf | Bestand:Frames pilotbook april 2017.pdf | Frames pilots | Interreg | april 1, 2017 |
Bestand:J Kuzmin Final Thesis Report.pdf | Bestand:J Kuzmin Final Thesis Report.pdf | Possible secondary consequences of flooding in the municipality of Reimerswaal | Jake Kuzmin | augustus 1, 2014 |
Bestand:Preparing Kinderdijk for the future (verbeterde versie).pdf | Bestand:Preparing Kinderdijk for the future (verbeterde versie).pdf | Exploratory study Albasserwaard pilot by HZ students | Students of HZ University of Applied Sciences | januari 20, 2017 |
FRAMES' Webspace | Resource Hyperlink 00270 | FRAMES' Webspace | North Sea Region | oktober 1, 2016 |
Bestand:Thesis Thijs Hillebrand FINAL.pdf | Bestand:Thesis Thijs Hillebrand FINAL.pdf | Final Thesis Research Thijs Hillebrand | Thijs Hillebrand | juni 5, 2017 |
Page name | Title | Summary | |
---|---|---|---|
Mijn geleerde les | LL Test Hans 1 | Mijn geleerde les | Ik heb veel van deze ervaring geleerd. |