Ninove (BE)



}













Project summary

Flood risks in Flanders are increasing, due to continuing land sealing and climate change. Addressing these risks will not be possible with protective measures only (e.g. embankments, flood retention zones, etc.) but will necessitate a wide set of measures. Some of these measures will require action to be taken by citizens. Considering the fact that Flemish flood risk management has limited experience with citizen engagement, it can be expected that the implementation of individual and community-based measures will not be self-evident and might even meet resistance. Within FRAMES, the Province of East-Flanders and Ghent University will investigate the possibilities of individual and community-based flood risk action and how it can be encouraged. In the flood-prone areas of Ninove and Denderleeuw, participatory planning processes will unite inhabitants to explore the possibilities of this type of measures, their potential co-benefits and how citizens’ capacities can be strengthened to implement them.

Project summary

Flood risks in Flanders are increasing, due to continuing land sealing and climate change. Addressing these risks will not be possible with protective measures only (e.g. embankments, flood retention zones, etc.) but will necessitate a wide set of measures. Some of these measures will require action to be taken by citizens. Considering the fact that Flemish flood risk management has limited experience with citizen engagement, it can be expected that the implementation of individual and community-based measures will not be self-evident and might even meet resistance. Within FRAMES, the Province of East-Flanders and Ghent University will investigate the possibilities of individual and community-based flood risk action and how it can be encouraged. In the flood-prone areas of Ninove and Denderleeuw, participatory planning processes will unite inhabitants to explore the possibilities of this type of measures, their potential co-benefits and how citizens’ capacities can be strengthened to implement them.

Start date: oktober 1, 2016
End date: januari 31, 2020
Objective: The main goals of the pilot cases in Ninove and Denderleeuw are the following:

1. Increasing inhabitants awareness of local flood risks and on individual and community-based measures that could be taken

2. Creating co-ownership of flood risk management (taking on co-responsibility)

3. Increasing inhabitants knowledge, social networks and economic capacity to take flood risk measures

4. Stimulating overall spatial and social district development (exploring co-benefits with other issues at hand)

Target: 1 - 3.000 inhabitants

2 - 25 businesses

Manager: Hannelore Mees, Barbara Tempels
Partner(s): Provincie Oost-Vlaanderen, Ghent University
Stakeholder(s):



Project results and process





Sub projects


No sub projects identified yet.

Participants and students

No participants included yet.

No students included yet.

Sources

Sources created in this page

No sources added yet.

All sources

  Page name Title Author(s) Date
Bestand:20180430 Paper Aesop FRAMES.pdf Bestand:20180430 Paper Aesop FRAMES.pdf Adaptive planning for flood resilient areas: dealing with complexity in decision-making about multilayered flood risk management Buijs, J-M., Boelens, L., Bormann, H., Restemeyer, B., Terpstra, T. januari 1, 2018
Bestand:Comparing the flood resilience of Southwell with the Dutch MLS approach (verbeterde versie).pdf Bestand:Comparing the flood resilience of Southwell with the Dutch MLS approach (verbeterde versie).pdf Exploratory study Southwell pilot by HZ students Students of HZ University of Applied Sciences januari 20, 2017
Bestand:FRAMES Monitoring Survey 1 Alblasserwaard Completed.pdf Bestand:FRAMES Monitoring Survey 1 Alblasserwaard Completed.pdf Monitoring survey Frames Smeets, L., Neefjes, P., Revet, C. & Wijnen, D. september 6, 2018
Bestand:Final Report Draft 1.0 Vejle.pdf Bestand:Final Report Draft 1.0 Vejle.pdf Exploratory study Vejle pilot by HZ students Students of HZ University of Applied Sciences januari 20, 2017
Bestand:Final Research Denderleeuw Research Assignment (verbeterde versie).pdf Bestand:Final Research Denderleeuw Research Assignment (verbeterde versie).pdf Exploratory study Denderleeuw pilot by HZ students Students of HZ University of Applied Sciences januari 20, 2017
Bestand:Final Thesis Community Resilience Assessment Tool Izhar van EenennaamV4.pdf Bestand:Final Thesis Community Resilience Assessment Tool Izhar van EenennaamV4.pdf Final Thesis Report Izhar van Eenennaam Izhar van Eenennaam juni 5, 2017
Bestand:Final report Wesermarsch research PDF.pdf Bestand:Final report Wesermarsch research PDF.pdf Exploratory study Wesermarsch pilot by HZ students Students of HZ University of Applied Sciences januari 20, 2017
Bestand:Frames pilotbook april 2017.pdf Bestand:Frames pilotbook april 2017.pdf Frames pilots Interreg april 1, 2017
Bestand:J Kuzmin Final Thesis Report.pdf Bestand:J Kuzmin Final Thesis Report.pdf Possible secondary consequences of flooding in the municipality of Reimerswaal Jake Kuzmin augustus 1, 2014
Bestand:Preparing Kinderdijk for the future (verbeterde versie).pdf Bestand:Preparing Kinderdijk for the future (verbeterde versie).pdf Exploratory study Albasserwaard pilot by HZ students Students of HZ University of Applied Sciences januari 20, 2017
FRAMES' Webspace Resource Hyperlink 00270 FRAMES' Webspace North Sea Region oktober 1, 2016
Bestand:Thesis Thijs Hillebrand FINAL.pdf Bestand:Thesis Thijs Hillebrand FINAL.pdf Final Thesis Research Thijs Hillebrand Thijs Hillebrand juni 5, 2017

Lessons learned

  Page name Title Summary
Mijn geleerde les LL Test Hans 1 Mijn geleerde les Ik heb veel van deze ervaring geleerd.